Samsun 7th District Directorate for State Hydraulic Works, Distribution 19 Mayis Dam Line Construction Work
Samsun 7th District Directorate for State Hydraulic Works, Distribution 19 Mayis Dam Line Construction Work

The contract regarding the work undertaken by Yayla-Kur Joint Venture that we own 51% shares was signed by the parties on 30.09.2016 and the site delivery was made on 10.10.2016. The construction period of the said work is about 820 days.